Needham High School Tennis Court and Site Improvement Project
Location: Needham High School Campus
Construction Timeline: Spring 2025 – September 2025
Funding: Fall 2024 Town Meeting appropriation, including $1.1 million from the General Reserve Fund
Design Firm: Activitas
Construction Firm: Argus Construction Corp
Project Overview:
The Needham High School Tennis Court and Site Improvement Project supports the Town's commitment to high-quality public school athletics and enhanced campus infrastructure. Needham Public Schools offer the most athletic opportunities of any public district in Massachusetts for grades 6–12, and Needham High School (home of the Rockets) fields 13 varsity sports and 4 club sports in the spring alone, including a thriving tennis program. The current four tennis courts are not sufficient to meet program demand or to host tournaments, making this project a key investment in student opportunity and community engagement.
The project includes the construction of eight new post-tensioned concrete tennis courts, which offer long-term durability, minimal maintenance, and resistance to cracking. Additional site improvements include demolition of existing courts, regrading, landscaping, and enhanced handicap accessibility.
Situated on a hilltop prone to wind and rain exposure, the campus upgrades are carefully designed by Activitas, a firm with deep experience in campus and athletic facility planning, and will be built by Argus Construction Corp, a local contractor specializing in athletic facilities. This project is scheduled for completion before the start of the 2025–2026 school year.
Impact:
This investment strengthens Needham’s reputation for excellence in athletics, supports the health and development of students, and reflects the community’s pride in its schools and forward-thinking spirit.
Project Progress
-
0404205_NHS Tennis Courts_Existing Courts and Fence Removal
-
04042025_NHS Tennis Courts_Construction Fencing and Earthwork
-
04042025_NHS Tennis Courts_Existing Fencing at Property Line
-
04042025_NHS Tennis Courts_Removal of Existing Fencing and Installation of Construction Fence
-
04112025_NHS Tennis Courts_Excavating Stripping and Piling Topsoil
-
04112025_NHS Tennis Courts_Rough Grading
-
04112025_NHS Tennis Courts_Stone Retaining Wall Mock Up
-
04252025_NHS Tennis Courts_New Water Line 1
-
04252025_NHS Tennis Courts_New Water Line 2
-
04252025_NHS Tennis Courts_Water Line Installation
-
05022025_NHS Tennis Courts_Excavation for Wall Footings
-
05022025_NHS Tennis Courts_Westerly Portion of Site at Subgrade
-
05092025_NHS Tennis Courts_Concrete Footing and Seating
-
05092025_NHS Tennis Courts_Screening of Footing Concrete
-
05092025_NHS Tennis Couts_Concrete Footing Completion
-
05232025_NHS Tennis Courts_Stone Walls
-
06062025_NHS Tennis Courts_Expanse of Stone Base for Courts
-
06062025_NHS Tennis Courts_Final Preparation for Platform Sub Base
-
06062025_NHS Tennis Courts_Inground Irrigation Line Installation
-
06062025_NHS Tennis Courts_Proof Rolling of Tennis Court Base
-
06112025_NHS Tennis Courts_Concrete Court Surface
-
06122025_NHS Tennis Courts_Gravel and Stone Base Under Concrete Slab
-
06122025_NHS Tennis Courts_Concrete Court Surface Curing
-
06122025_NHS Tennis Courts_Steel Post Tensioning Rods
-
06122025_NHS Tennis Courts_Stone Base Below Concrete
-
06192025_NHS Tennis Courts_Concrete Footings for Walls
-
06192025_NHS Tennis Courts_Concrete Test Cylinder for Compressive Strength Testing
-
06232025_NHS Tennis Courts_Remaining Tree Stumps from Clearing
-
06242025_NHS Tennis Courts_Concrete Court Surface
-
06242025_NHS Tennis Courts_Gravel and Stone Placement of Sub-base Material
-
06242025_NHS Tennis Courts_Stone Base Surrounding and Below Court Surface
-
06242025_NHS Tennis Courts_Sub-base with Fence Posts Installed
-
06252025_NHS Tennis Courts_Court Fencing Posts
-
07112025_NHS Tennis Courts_Drainage Structures for Stormwater Detention Basin
-
07162025_NHS Tennis Courts_Edge of Detention Basin
-
07162025_NHS Tennis Courts_Filter Fabric Installation
-
07162025_NHS Tennis Courts_Grading and Shaping Over Detention Basin
-
07162025_NHS Tennis Courts_Stone Base Installation Over Detention Basin
-
07172025_NHS Tennis Courts_Grading and Shaping Over Detention Basin
-
07182025_NHS Tennis Courts_Corner Fence Posts Prior to Chain Link Installation
-
07182025_NHS Tennis Courts_Grading and Shaping
-
07182025_NHS Tennis Courts_Gravel Sub-base Installation
- 1 0404205_NHS Tennis Courts_Existing Courts and Fence Removal
- 2 04042025_NHS Tennis Courts_Construction Fencing and Earthwork
- 3 04042025_NHS Tennis Courts_Existing Fencing at Property Line
- 4 04042025_NHS Tennis Courts_Removal of Existing Fencing and Installation of Construction Fence
- 5 04112025_NHS Tennis Courts_Excavating Stripping and Piling Topsoil
- 6 04112025_NHS Tennis Courts_Rough Grading
- 7 04112025_NHS Tennis Courts_Stone Retaining Wall Mock Up
- 8 04252025_NHS Tennis Courts_New Water Line 1
- 9 04252025_NHS Tennis Courts_New Water Line 2
- 10 04252025_NHS Tennis Courts_Water Line Installation
- 11 05022025_NHS Tennis Courts_Excavation for Wall Footings
- 12 05022025_NHS Tennis Courts_Westerly Portion of Site at Subgrade
- 13 05092025_NHS Tennis Courts_Concrete Footing and Seating
- 14 05092025_NHS Tennis Courts_Screening of Footing Concrete
- 15 05092025_NHS Tennis Couts_Concrete Footing Completion
- 16 05232025_NHS Tennis Courts_Stone Walls
- 17 06062025_NHS Tennis Courts_Expanse of Stone Base for Courts
- 18 06062025_NHS Tennis Courts_Final Preparation for Platform Sub Base
- 19 06062025_NHS Tennis Courts_Inground Irrigation Line Installation
- 20 06062025_NHS Tennis Courts_Proof Rolling of Tennis Court Base
- 21 06112025_NHS Tennis Courts_Concrete Court Surface
- 22 06122025_NHS Tennis Courts_Gravel and Stone Base Under Concrete Slab
- 23 06122025_NHS Tennis Courts_Concrete Court Surface Curing
- 24 06122025_NHS Tennis Courts_Steel Post Tensioning Rods
- 25 06122025_NHS Tennis Courts_Stone Base Below Concrete
- 26 06192025_NHS Tennis Courts_Concrete Footings for Walls
- 27 06192025_NHS Tennis Courts_Concrete Test Cylinder for Compressive Strength Testing
- 28 06232025_NHS Tennis Courts_Remaining Tree Stumps from Clearing
- 29 06242025_NHS Tennis Courts_Concrete Court Surface
- 30 06242025_NHS Tennis Courts_Gravel and Stone Placement of Sub-base Material
- 31 06242025_NHS Tennis Courts_Stone Base Surrounding and Below Court Surface
- 32 06242025_NHS Tennis Courts_Sub-base with Fence Posts Installed
- 33 06252025_NHS Tennis Courts_Court Fencing Posts
- 34 07112025_NHS Tennis Courts_Drainage Structures for Stormwater Detention Basin
- 35 07162025_NHS Tennis Courts_Edge of Detention Basin
- 36 07162025_NHS Tennis Courts_Filter Fabric Installation
- 37 07162025_NHS Tennis Courts_Grading and Shaping Over Detention Basin
- 38 07162025_NHS Tennis Courts_Stone Base Installation Over Detention Basin
- 39 07172025_NHS Tennis Courts_Grading and Shaping Over Detention Basin
- 40 07182025_NHS Tennis Courts_Corner Fence Posts Prior to Chain Link Installation
- 41 07182025_NHS Tennis Courts_Grading and Shaping
- 42 07182025_NHS Tennis Courts_Gravel Sub-base Installation
Significant progress was made on the NHS Tennis Court project throughout April. Demolition activities, including the removal of trees and the existing fencing, were completed early in the month, followed by the installation of a construction fence. Earthwork dominated much of the effort, beginning with topsoil stripping and continuing with the pulverization and reclamation of the old court surfaces to be reused in the subbase. Coordination with the Water Department also began, leading to the delivery of water line materials and on-site discussions regarding utility relocation. A stone wall mockup was delivered and subsequently approved, allowing masonry planning to advance. Toward the end of the month, trenching for the water main installation commenced, while earthwork operations near the drainage areas remained ongoing. Overall, April marked a strong start to the project’s foundational phases.
The NHS Tennis Court project saw continued advancement through May, with key milestones achieved despite weather-related delays. Early in the month, the water main installation was completed, and excavation reached subgrade across much of the site, including the westerly and northerly portions. Wall footing excavation and placement proceeded as scheduled, and rough grading efforts moved to the southerly end. Tree trimming was also conducted to clear working areas. Rain significantly impacted the week of May 16, requiring extensive pumping to remove standing water and resulting in the postponement of the water main tie-in. However, the connection was successfully completed the following week. By the end of the month, wall construction was finalized, and site grading efforts continued, keeping the project moving forward toward the next phase of development.
June saw major progress on utility connections, court construction, and site infrastructure. Water testing was successfully completed, and the final water line connection was made and flushed. Significant work occurred at the courts, including completion of formwork, tendon installation, concrete placement, and post-tensioning to lift the slabs off the ground. Measures were taken to ensure proper curing of the concrete, and by month’s end, post-tensioning was nearly complete. Storm drain installation progressed throughout the site, along with the addition of concrete sidewalks and seating areas. Chain link fence posts began to be installed, ACO drains were delivered, and finish grading neared completion. Formwork also began for the perimeter concrete curbing, marking continued advancement of hardscape elements.
In July, substantial progress was made on drainage, hardscaping, and fencing. Chain link fence post installation was completed early in the month, and finish grading across the site was finalized. Formwork for the perimeter concrete curbing was completed, followed by installation of the curbs themselves. Drainage work continued steadily, including installation of area drains, large drain structures, and the channel drain system. Excavation and installation of the detention basins were completed, with filter fabric placed and backfilling underway. Access manholes were also set in place, and work progressed on backfilling the subsurface drainage system, marking a key phase in completing the site’s stormwater infrastructure.